- Remove any vegetation from the area where you have chosen to construct your base
- Use pegs and string to mark out an area for your base. Measure the lengths between opposite angles to ensure the area is square and not slanted. These lengths will be equal if the base is square.
- Excavate the ground in the marked out area to around 6” (150mm) deep.
- Within the excavated area, lay approximately 3” (75mm) of firmly compacted hardcore, scalping or brick rubble to act as a sound foundation and level with compacted sand if appropriate. You may wish to use a rake to aid with the levelling process. Remove the pegs and string.
- By measuring, cutting and fitting timber rails or steel shuttering to the shape of the base, board up the base as portrayed in the diagram. Use a tape measure, spirit level, and tri-square to ensure the base with shuttering is 100% level and square.
- You should then lay approximately 3” (75mm) of concrete. Concrete can be produced using either bags of dry mixed concrete with small amounts of water added at a time, or making a mixture of ‘all-in’ ballast, cement and water. For this second alternative, it is mixed in the ratio of 1 part of cement for 5 parts ‘all-in’ ballast. ‘All-in’ ballast is sold in 40kg bags at most building merchants or DIY stores (Note approx 1.25 will be required to produce around 1 cubic foot of concrete). Do not allow the mix to become too wet as this will weaken the concrete.
- Spread the concrete evenly in the shuttering, taking particular care to push the concrete into the corners and edges. Arguably the best method to lay the concrete is to do it a layer at a time and compact it until the shuttering frame is full. Leave the concrete flush with the top of the framework and smooth it out using either a wooden or plastic float.
- The concrete must then be covered over with sheets to allow it to dry naturally. Please note however that the concrete must not be allowed to dry out too quickly and so spraying it with water may be necessary, particularly in warm and dry weather conditions.
- Once firm and dry the base is now ready for you to begin assembly of your garden building.
- Remove any vegetation from the area where you have chosen to construct your base.
- Use pegs and string to mark out an area for your base. Measure the lengths between opposite angles to ensure the area is square and not slanted. These lengths will be equal if the base is square.
- Excavate the ground in the marked out area to around 2.5″ (63.5mm) deep. Remove the pegs and string.
- Within the excavated area, lay approximately 1.5″ (40mm) mix of one part cement to eight parts building sand. This will create a dry sand and cement mix. Level this mix – you may wish to use a rake and a spirit level to aid with the levelling process.
- Starting from a corner lay the paving slabs and tap down with a rubber mallet. The surface of the paving slabs should be slightly higher than the surrounding ground to encourage rain water drainage. Use a spirit level to make sure all the slabs are square, level and firmly butted together.
- Brush off any excess sand and cement mix – the base is now ready for you to begin assembly of your garden building.
- Remove any vegetation from the area where you have chosen to contrast your base.
- Use pegs and string to mark out an area for your base. Measure the lengths between opposite angles to ensure the area is square and not slanted. These lengths will be equal if the base is square.
- Excavate the ground in the marked out area to around 2″ (50mm) deep. Remove the pegs and string.
- Within the excavated area, lay approximately 1.5″ (40mm) gravel or soil. Level this mix – you may wish to use a rake and a spirit level to aid with the levelling process..
- Lay either concrete floor bearers or pressure treated (tanalised) timber bearers across the gravel/soil. These should be equally spaced at intervals of approx 400-600mm ensuring they are to run perpendicular to any floor joists which already come built in to your garden building.
- Make certain that all floor bearers are level with one another by using a spirit level. Use a rubber mallet to tap down the bearers if necessary.
- How many floor bearers will I need?
This is dependant completely on the size of your shed – here’s a few examples;
- 6×4 garden building – 4 bearers at 1150mm (4ft) long
- 7×5 garden building – 4 bearers at 1450mm (5ft) long
- 8×6 garden building – 5 bearers at 1750mm (6ft) long
- 10×8 garden building – 6 bearers at 2350mm (8ft) long